This page tracks the project status, incubator-wise.
The Muse project graduated on 2005-06-03
This page tracks the project status, incubator-wise.
The Muse project graduated on 2005-06-03
A Web Services subproject that provides an implementation of the OASIS Web Services Distributed Management (WSDM) family of specifications.
item | type | reference |
---|---|---|
Website | www | http://incubator.apache.org/muse/ |
Proposal | wiki | http://wiki.apache.org/incubator/MuseProposal |
Mailing Lists | dev | muse-dev@ws.apache.org |
. | svn | muse-cvs@incubator.apache.org |
Bug Tracking | jira | http://nagoya.apache.org/jira/secure/project/ViewProject.jspa?pid=1061 |
Source Code | svn | https://svn.apache.org/repos/asf/incubator/muse/ |
Mentors | dims | Davanum Srinivas |
Committers | gawor | Jarek Gawor |
. | ips | Ian Springer |
. | kidz | Kinga Dziembowski |
. | meder | Sam Meder |
. | scamp | Sal Campana |
. | wire | Bill Reichardt |
This is the first phase on incubation, needed to start the project at Apache.
Item assignment is shown by the Apache id. Completed tasks are shown by the completion date (YYYY-MM-dd).
date | item |
---|---|
2005-04-18 | Make sure that the requested project name does not already exist and check http://www.nameprotect.com/ to be sure that the name is not already trademarked for an existing software product. |
2004-11-04 | If request from outside Apache to enter an existing Apache project, then post a message to that project for them to decide on acceptance. |
date | item |
---|---|
2004-11-04 | Identify all the Mentors for the incubation, by asking all that can be Mentors. |
2004-11-04 | Subscribe all Mentors on the pmc and general lists. |
2004-11-04 | Give all Mentors access to all incubator CVS modules. (to be done by PMC chair) |
2004-11-04 | Tell Mentors to track progress in the file 'incubator/projects/{project.name}.cwiki' |
date | item |
---|---|
2005-01-05 | Check and make sure that the papers that transfer rights to the ASF been received. It is only necessary to transfer rights for the package, the core code, and any new code produced by the project. |
2004-11-04 | Check and make sure that the files that have been donated have been updated to reflect the new ASF copyright. |
date | item |
---|---|
2005-04-26 | Check and make sure that all code included with the distribution that is not under the Apache license has the right to combine with Apache-licensed code and redistribute. |
2005-04-21 | Check and make sure that all source code distributed by the project is covered by one or more of the following approved licenses: Apache, BSD, Artistic, MIT/X, MIT/W3C, MPL 1.1, or something with essentially the same terms. |
date | item |
---|---|
2004-11-08 | Check that all active committers have submitted a contributors agreement. |
2004-11-08 | Add all active committers in the STATUS file. |
2004-11-08 | Ask root for the creation of committers' accounts on cvs.apache.org. |
date | item |
---|---|
2004-11-15 | Ask infrastructure to create source repository modules and grant the committers karma. |
2004-11-15 | Ask infrastructure to set up and archive Mailing lists. |
2004-11-15 | Decide about and then ask infrastructure to setup an issuetracking system (Bugzilla, Scarab, Jira). |
2004-11-15 | Migrate the project to our infrastructure. |
date | item |
---|---|
2005-12-15 | Carry over the interfaces used in the Globus WSRF/WSN impl (Subscription, Topic, etc.). |
2005-04-23 | Participate in the OASIS WSDM 1.0 interop. |
These action items have to be checked for during the whole incubation process.
These items are not to be signed as done during incubation, as they may change during incubation. They are to be looked into and described in the status reports and completed in the request for incubation signoff.
Add project specific tasks here.
Things to check for before voting the project out.