The Apache Software Foundation
The Apache Software Foundation Incubator

Bean Validation Project Incubation Status

This page tracks the project status, incubator-wise. For more general project status, look on the project website.

The Bean Validation project graduated on 2012-02-15

Description

The Bean Validation project will create an implementation of the Java EE Bean Validation specification.

News

  • 2010-03-01 Project enters incubation.

Project info

  • link to the main website
  • link to the page(s) that tell how to participate (Website,Mailing lists,Bug tracking,Source code)
  • link to the project status file (Committers,non-incubation action items,project resources, etc)

If the project website and code repository are not yet setup, use the following table:

item type reference
Website www http://incubator.apache.org/bval/
. wiki http://cwiki.apache.org/confluence/display/BeanValidation/
Mailing list dev bval-dev@incubator.apache.org
. commits bval-commits@incubator.apache.org
Bug tracking . https://issues.apache.org/jira/browse/BVAL
Source code SVN https://svn.apache.org/repos/asf/incubator/bval/
Mentors kevan Kevan Miller
. niallp Niall Pemberton
. lresende Luciano Resende
. matzew Matthias Wessendorf
Committers romanstumm Roman Stumm
. dwoods Donald Woods
. mnour Mohammad Nour El-Din
. simonetripodi Simone Tripodi
. jrbauer Jeremy Bauer
. gpetracek Gerhard Petracek
. struberg Mark Struberg

Incubation status reports

Incubation work items

Project Setup

This is the first phase on incubation, needed to start the project at Apache.

Item assignment is shown by the Apache id. Completed tasks are shown by the completion date (YYYY-MM-dd).

Identify the project to be incubated

date item
2012-01-08 Make sure that the requested project name does not already exist and check www.nameprotect.com to be sure that the name is not already trademarked for an existing software product. DONE via trademarkia.com and others
2012-01-08 If request from an existing Apache project to adopt an external package, then ask the Apache project for the SVN module and mail address names. DONE, not applicable.
2012-01-08 If request from outside Apache to enter an existing Apache project, then post a message to that project for them to decide on acceptance. DONE, not applicable.
2012-01-08 If request from anywhere to become a stand-alone PMC, then assess the fit with the ASF, and create the lists and modules under the incubator address/module names if accepted. DONE, not applicable.

Infrastructure

date item
2010-03-23 Ask infrastructure to create source repository modules and grant the committers karma.
(see INFRA-2528 and INFRA-2529)
2010-03-12 Ask infrastructure to set up and archive mailing lists.
(see INFRA-2527)
2010-03-16 Ask infrastructure to set up issue tracker (JIRA, Bugzilla).
(see INFRA-2530)
2010-03-17 Ask infrastructure to set up wiki (Confluence, Moin).
(see INFRA-2531)
2010-03-17 Migrate the project to our infrastructure.
(see r924153)

Mentor-related responsibility/oversight

date item
2010-02-23 Identify all the Mentors for the incubation, by asking all that can be Mentors.
(see Vote thread)
2010-03-12 Subscribe all Mentors on the pmc and general lists.
2010-03-12 Give all Mentors access to the incubator SVN repository. (to be done by the Incubator PMC chair or an Incubator PMC Member wih karma for the authorizations file)
2010-04-05 Tell Mentors to track progress in the file 'incubator/projects/{project.name}.html'
(see here)
date item
2009-10-27 Check and make sure that the papers that transfer rights to the ASF been received. It is only necessary to transfer rights for the package, the core code, and any new code produced by the project.
(Software Grant from KEBA AG)
2010-03-17 Check and make sure that the files that have been donated have been updated to reflect the new ASF copyright.
(see BVAL-3)

Verify distribution rights

date item
N/A Check and make sure that for all code included with the distribution that is not under the Apache license, we have the right to combine with Apache-licensed code and redistribute.
(all code is being distributed under AL 2.0)
N/A Check and make sure that all source code distributed by the project is covered by one or more of the following approved licenses: Apache, BSD, Artistic, MIT/X, MIT/W3C, MPL 1.1, or something with essentially the same terms.
(all code is being distributed under AL 2.0)

Establish a list of active committers

date item
2010-03-23 Check that all active committers have submitted a contributors agreement.
(see INFRA-2529)
2010-03-23 Add all active committers in the STATUS file.
2010-03-23 Ask root for the creation of committers' accounts on people.apache.org.
(see INFRA-2529)

Project specific

Add project specific tasks here.

Incubation

These action items have to be checked for during the whole incubation process.

These items are not to be signed as done during incubation, as they may change during incubation. They are to be looked into and described in the status reports and completed in the request for incubation signoff.

Collaborative Development

  • Have all of the active long-term volunteers been identified and acknowledged as committers on the project? (checked, DONE.)
  • Are there three or more independent committers? (The legal definition of independent is long and boring, but basically it means that there is no binding relationship between the individuals, such as a shared employer, that is capable of overriding their free will as individuals, directly or indirectly.) (checked, DONE.)
  • Are project decisions being made in public by the committers? (DONE.)
  • Are the decision-making guidelines published and agreed to by all of the committers? (checked, DONE.)

Licensing awareness

  • Are all licensing, trademark, credit issues being taken care of and acknowleged by all committers? (checked, DONE.)

Project Specific

Add project specific tasks here.

Exit

Things to check for before voting the project out.

Organizational acceptance of responsibility for the project

  • If graduating to an existing PMC, has the PMC voted to accept it?
  • If graduating to a new PMC, has the board voted to accept it?

Incubator sign-off

  • Has the Incubator decided that the project has accomplished all of the above tasks?