Traffic Control Project Incubation Status

This page tracks the project status, incubator-wise. For more general project status, look on the project website.

The Traffic Control project graduated on 2018-05-16

Description

Traffic Control is a set of components that can be used to build, monitor, configure, and provision a large scale content delivery network (CDN).

News

  • 2018-05-16 The Apache Board establishes Traffic Control as a TLP
  • 2018-01-22 Version 2.1.0 released
  • 2017-11-01 New committer: Nir Sopher
  • 2017-10-16 New committer: Peter Ryder
  • 2017-08-10 New committer: Derek Gelinas
  • 2017-08-10 New committer: Rob Butts
  • 2017-07-07 Version 2.0.0 released
  • 2017-06-13 Version 1.8.1 released
  • 2017-03-07 Version 1.8.0 released
  • 2016-07-12 Project enters incubation.

Project info

item type reference
Website www https://trafficcontrol.incubator.apache.org/
. wiki https://cwiki.apache.org/confluence/display/TC/Traffic+Control+Home
Mailing list commits users@trafficcontrol.incubator.apache.org
. dev dev@trafficcontrol.incubator.apache.org
. commits commits@trafficcontrol.incubator.apache.org
. issues issues@trafficcontrol.incubator.apache.org
. private private@trafficcontrol.incubator.apache.org
. security security@trafficcontrol.incubator.apache.org
Bug tracking Github Issues https://github.com/apache/incubator-trafficcontrol/issues
Source code Github https://github.com/apache/incubator-trafficcontrol.git
Mentors sorber Phil Sorber
. covener Eric Covener
. zwoop Leif Hedstrom
Committers dangogh Dan Kirkwood
. neuman David Neuman
. dewrich Dewayne Richardson
. friede Eric Friedrich
. hbeatty Hank Beatty
. jheitz200 Jackie Heitzer
. jvd Jan van Doorn
. elsloo Jeff Elsloo
. mitchell852 Jeremy Mitchell
. mtorluemke Mark Torluemke
. smalenfant Steve Malenfant
. rob Rob Butts
. peryder Peter Ryder
. dgelinas Derek Gelinas
. smalenfant Steve Malenfant
. nir Nir Sopher
Extra . .

Incubation status reports

Incubation work items

Project Setup

This is the first phase on incubation, needed to start the project at Apache.

Item assignment is shown by the Apache id. Completed tasks are shown by the completion date (YYYY-MM-dd).

Identify the project to be incubated

date item
2017-10-16 Make sure that the requested project name does not already exist. Please follow the guide to ensure a suitable project/product name.https://issues.apache.org/jira/browse/PODLINGNAMESEARCH-113
NA If request from an existing Apache project to adopt an external package, then ask the Apache project for the SVN module and mail address names.
NA If request from outside Apache to enter an existing Apache project, then post a message to that project for them to decide on acceptance.
2016-10-04 If request from anywhere to become a stand-alone PMC, then assess the fit with the ASF, and create the lists and modules under the incubator address/module names if accepted.

Infrastructure

date item
2016-10-31 Ask infrastructure to set up and archive mailing lists.https://issues.apache.org/jira/browse/INFRA-12527
2016-09-17 Ask infrastructure to create source repository modules and grant the committers karma.https://issues.apache.org/jira/browse/INFRA-14217
2017-09-26 Ask infrastructure to set up issue tracker (JIRA, Bugzilla). https://issues.apache.org/jira/browse/INFRA-14217
2016-10-28 Ask infrastructure to set up wiki (Confluence, Moin).https://issues.apache.org/jira/browse/INFRA-12799
2016-10-17 Migrate the project to our infrastructure.

Mentor-related responsibility/oversight

date item
2016-07-12 Subscribe all Mentors on the pmc and general lists.
2016-07-12 Give all Mentors access to the incubator GitHub repository. (to be done by the Incubator PMC chair or an Incubator PMC Member wih karma for the authorizations file)
2016-07-12 Tell Mentors to track progress in the file 'incubator/projects/{project.name}.html'
date item
NA Check and make sure that the papers that transfer rights to the ASF been received. It is only necessary to transfer rights for the package, the core code, and any new code produced by the project.
NA Check and make sure that the files that have been donated have been updated to reflect the new ASF copyright.

Verify distribution rights

date item
2016-07-12 Check and make sure that for all code included with the distribution that is not under the Apache license, we have the right to combine with Apache-licensed code and redistribute.
2016-07-12 Check and make sure that all source code distributed by the project is covered by one or more of the following approved licenses: Apache, BSD, Artistic, MIT/X, MIT/W3C, MPL 1.1, or something with essentially the same terms.

Establish a list of active committers

date item
2016-08-02 Check that all active committers have submitted a contributors agreement.
2016-08-29 Add all active committers in the relevant section above.
2016-08-22 Ask root for the creation of committers' accounts in LDAP.

Project specific

Add project specific tasks here.

Incubation

These action items have to be checked for during the whole incubation process.

These items are not to be signed as done during incubation, as they may change during incubation. They are to be looked into and described in the status reports and completed in the request for incubation signoff.

Collaborative Development

  • Have all of the active long-term volunteers been identified and acknowledged as committers on the project?
  • Are there three or more independent committers? (The legal definition of independent is long and boring, but basically it means that there is no binding relationship between the individuals, such as a shared employer, that is capable of overriding their free will as individuals, directly or indirectly.)
  • Are project decisions being made in public by the committers?
  • Are the decision-making guidelines published and agreed to by all of the committers?

Licensing awareness

  • Are all licensing, trademark, credit issues being taken care of and acknowleged by all committers?

Project Specific

Add project specific tasks here.

Exit

Things to check for before voting the project out.

Organizational acceptance of responsibility for the project

  • The incubator PMC has voted and accepted Traffic Control for graduation, 2018-04-24
  • The Apache Board Accepted Traffic Control as a TLP, 2018-05-16

Incubator sign-off