Log4cxx Project Incubation Status

This page tracks the project status, incubator-wise. For more general project status, look on the project website.

Description

Log4cxx implements a logging API similar to log4j but in C++. On 2013-12-09, the log4cxx project has decided to return to the incubator with a new group of committers.

The log4cxx2 project graduated on 2017-03-16

News

  • 2013-12-09: Log4cxx returns to the incubator with a new group of committers

Project info

item type reference
Website www logging.apache.org/log4cxx
Mailing list dev log4cxx-dev@logging.apache.org
. user log4cxx-user@logging.apache.org
Bug tracking Bugzilla https://issues.apache.org/jira/browse/LOGCXX
Source code SVN http://svn.apache.org/repos/asf/incubator/log4cxx/
Mentors
rgoers Ralph Goers
Committers fseydoux Florian Seydoux
chand chand priyankara
nickwilliams Nick Williams
tschoening Thorsten Schöning
rhys Rhys Ulerich
joseph Joseph Southwell
alexz Alexandru Zbârcea

Incubation status reports

  • tbd

Incubation work items

Project Setup

This is the first phase on incubation, needed to start the project at Apache.

Item assignment is shown by the Apache id. Completed tasks are shown by the completion date (YYYY-MM-dd).

Identify the project to be incubated

date item
N/A Make sure that the requested project name does not already exist and check www.nameprotect.com to be sure that the name is not already trademarked for an existing software product.
N/A If request from an existing Apache project to adopt an external package, then ask the Apache project for the SVN module and mail address names.
N/A If request from outside Apache to enter an existing Apache project, then post a message to that project for them to decide on acceptance.
N/A If request from anywhere to become a stand-alone PMC, then assess the fit with the ASF, and create the lists and modules under the incubator address/module names if accepted.

Infrastructure

date item
....-..-.. Ask infrastructure to create source repository modules and grant the committers karma.
2013-12-12 Ask infrastructure to set up and archive mailing lists.
2013-12-12 Ask infrastructure to set up issue tracker (JIRA, Bugzilla).
N/A Ask infrastructure to set up wiki (Confluence, Moin).
2013-12-12 Migrate the project to our infrastructure.

Mentor-related responsibility/oversight

date item
2013-12-12 Identify all the Mentors for the incubation, by asking all that can be Mentors.
2013-12-12 Subscribe all Mentors on the pmc and general lists.
....-..-.. Give all Mentors access to the incubator SVN repository. (to be done by the Incubator PMC chair or an Incubator PMC Member wih karma for the authorizations file)
2013-12-12 Tell Mentors to track progress in the file 'incubator/projects/{project.name}.html'
date item
2013-12-12 Check and make sure that the papers that transfer rights to the ASF been received. It is only necessary to transfer rights for the package, the core code, and any new code produced by the project.
2013-12-12 Check and make sure that the files that have been donated have been updated to reflect the new ASF copyright.

Verify distribution rights

date item
2013-12-12 Check and make sure that for all code included with the distribution that is not under the Apache license, we have the right to combine with Apache-licensed code and redistribute.
2013-12-12 Check and make sure that all source code distributed by the project is covered by one or more of the following approved licenses: Apache, BSD, Artistic, MIT/X, MIT/W3C, MPL 1.1, or something with essentially the same terms.

Establish a list of active committers

date item
2013-12-12 Check that all active committers have submitted a contributors agreement.
....-..-.. Add all active committers in the STATUS file.
2013-12-16 Ask root for the creation of committers' accounts on people.apache.org.

Project specific

Add project specific tasks here.

Incubation

These action items have to be checked for during the whole incubation process.

These items are not to be signed as done during incubation, as they may change during incubation. They are to be looked into and described in the status reports and completed in the request for incubation signoff.

Collaborative Development

  • Have all of the active long-term volunteers been identified and acknowledged as committers on the project?
  • Are there three or more independent committers? (The legal definition of independent is long and boring, but basically it means that there is no binding relationship between the individuals, such as a shared employer, that is capable of overriding their free will as individuals, directly or indirectly.)
  • Are project decisions being made in public by the committers?
  • Are the decision-making guidelines published and agreed to by all of the committers?

Licensing awareness

  • Are all licensing, trademark, credit issues being taken care of and acknowleged by all committers?

Project Specific

Add project specific tasks here.

Exit

Things to check for before voting the project out.

Organizational acceptance of responsibility for the project

  • If graduating to an existing PMC, has the PMC voted to accept it?
  • If graduating to a new PMC, has the board voted to accept it?

Incubator sign-off

  • Has the Incubator decided that the project has accomplished all of the above tasks?