The Apache Software Foundation
The Apache Software Foundation Incubator

Apache Fluss Project Incubation Status

This page tracks the project status, incubator-wise. For more general project status, look on the project website.

Description

Fluss is a streaming storage built for real-time analytics which can serve as the real-time data layer for Lakehouse architectures.

News

  • 2025-06-05 Project enters incubation.

Project info

item type reference
Website www http://fluss.apache.org/
Mailing list dev dev@fluss.apache.org
. user user@fluss.apache.org
. private private@fluss.apache.org
. commits commits@fluss.apache.org
. issues issues@fluss.apache.org
. builds builds@fluss.apache.org
Bug tracking GitHub Issues https://github.com/apache/fluss/issues
Source code fluss https://github.com/apache/fluss.git
. fluss-website https://github.com/apache/fluss-website.git
Roster people.apache Fluss Roster
Roster Login people.apache Fluss Roster Login
Champion liyu Yu Li
Mentors jqin Becket Qin
. jbonofre Jean-Baptiste Onofré
. lzljs3620320 Jingsong Lee
. liyu Yu Li
. tison Zili Chen
Committers jark Jark Wu
. yuxia Yuxia Luo
. fengwang Feng Wang
. nicholasjiang Nicholas Jiang
. libenchao Benchao Li

Incubation status reports

Incubation work items

Project Setup

This is the first phase on incubation, needed to start the project at Apache.

Item assignment is shown by the Apache id. Completed tasks are shown by the completion date (YYYY-MM-dd).

Identify the project to be incubated

date item
2025-06-05 Make sure that the requested project name does not already exist. Please follow the guide to ensure a suitable project/product name.
N/A If request from an existing Apache project to adopt an external package, then ask the Apache project for the SVN module and mail address names.
N/A If request from outside Apache to enter an existing Apache project, then post a message to that project for them to decide on acceptance.
N/A If request from anywhere to become a stand-alone PMC, then assess the fit with the ASF, and create the lists and modules under the incubator address/module names if accepted.

Infrastructure

date item
2025-06-05 Request DNS (first step after creating podling status page)
2025-06-06 Request Mailing Lists
2025-06-15 Request git repositories
TBD Successfully set up issue tracker (GitHub Issues)
TBD Successfully set up wiki (Confluence)

Mentor-related responsibility/oversight

date item
2025-06-TBD Subscribe all Mentors on the pmc and general lists.
2025-06-TBD Give all Mentors access to the incubator Git repository. (to be done by the Incubator PMC chair or an Incubator PMC Member wih karma for the authorizations file)
2025-06-TBD Tell Mentors to track progress in the file 'incubator/projects/fluss.html'
date item
2025-06-TBD Check and make sure that the papers that transfer rights to the ASF been received. It is only necessary to transfer rights for the package, the core code, and any new code produced by the project.
2025-06-TBD Check and make sure that the files that have been donated have been updated to reflect the new ASF copyright.

Verify distribution rights

date item
2025-06-05 Check and make sure that for all code included with the distribution that is not under the Apache license, we have the right to combine with Apache-licensed code and redistribute.
2025-06-05 Check and make sure that all source code distributed by the project is covered by one or more of the following approved licenses: Apache, BSD, Artistic, MIT/X, MIT/W3C, MPL 1.1, or something with essentially the same terms.

Establish a list of active committers

date item
2025-06-TBD Check that all active committers have submitted a contributors agreement.
2025-06-TBD Add all active committers in the relevant section above.
2025-06-05 Ask root for the creation of committers' accounts in LDAP.

Project specific

Add project specific tasks here.

Incubation

These action items have to be checked for during the whole incubation process.

These items are not to be signed as done during incubation, as they may change during incubation. They are to be looked into and described in the status reports and completed in the request for incubation signoff.

Collaborative Development

  • Have all of the active long-term volunteers been identified and acknowledged as committers on the project?
  • Are there three or more independent committers? (The legal definition of independent is long and boring, but basically it means that there is no binding relationship between the individuals, such as a shared employer, that is capable of overriding their free will as individuals, directly or indirectly.)
  • Are project decisions being made in public by the committers?
  • Are the decision-making guidelines published and agreed to by all of the committers?

Licensing awareness

  • Are all licensing, trademark, credit issues being taken care of and acknowleged by all committers?

Project Specific

Add project specific tasks here.

Exit

Things to check for before voting the project out.

Organizational acceptance of responsibility for the project

  • If graduating to an existing PMC, has the PMC voted to accept it?
  • If graduating to a new PMC, has the board voted to accept it?

Incubator sign-off

  • Has the Incubator decided that the project has accomplished all of the above tasks?