The Apache Software Foundation
The Apache Software Foundation Incubator

Apache Asyncband Project Incubation Status

This page tracks the project status, incubator-wise. For more general project status, look on the project website.

Description

Asyncband is a runtime-agnostic library providing essential synchronization primitives for asynchronous Rust programming.

News

Project info

item type reference
Website www https://asyncband.apache.org/
Mailing list dev dev@asyncband.apache.org
. private private@asyncband.apache.org
. commits commits@asyncband.apache.org
Bug tracking GitHub Issue https://github.com/apache/asyncband/issues
Source code asyncband https://github.com/apache/asyncband.git
Roster people.apache Asyncband Roster
Roster Login people.apache Asyncband Roster Login
Champion twice Mingyang Liu
Mentors twice Mingyang Liu
Mentors xuanwo Hao Ding
. tison Zili Chen
. jbonofre Jean-Baptiste Onofré
Committers andylokandy Dian Luo
. ariesdevil Yijun Zhao
. iqwqi Bohao Zhang
. jbonofre Jean-Baptiste Onofré
. orthur Haixu Ouyang
. tison Zili Chen
. twice Mingyang Liu
. xuanwo Hao Ding
. xyz Yunze Xu

Incubation status reports

Incubation work items

Project Setup

This is the first phase on incubation, needed to start the project at Apache.

Item assignment is shown by the Apache id. Completed tasks are shown by the completion date (YYYY-MM-dd). Where the original completion date is not recorded, items explicitly marked as verified use the verification date.

Identify the project to be incubated

date item
2026-08-16 VP, Brand approved the Apache Asyncband name in PODLINGNAMESEARCH-257.
N/A If request from an existing Apache project to adopt an external package, then ask the Apache project for the SVN module and mail address names.
N/A If request from outside Apache to enter an existing Apache project, then post a message to that project for them to decide on acceptance.
N/A If request from anywhere to become a stand-alone PMC, then assess the fit with the ASF, and create the lists and modules under the incubator address/module names if accepted.

Infrastructure

date item
2026-11-09 Verified that asyncband.apache.org resolves and serves the project website.
2026-11-09 Verified the project mailing lists against the October infrastructure report and the public dev and commits archives. Mentor subscriptions are tracked separately below.
2026-11-09 Verified the ASF-hosted library repository and website repository.
2026-11-09 Verified the GitHub issue tracker.

Mentor-related responsibility/oversight

date item
2026-11-10 Mentor mailing-list subscriptions confirmed by tison.
2026-11-09 Verified that mentor tison can maintain the Incubator status records; see the status update in r1940199.
2026-11-09 Verified that incubation progress is tracked in content/projects/asyncband.xml and the podling reports. The status page is maintained by tison, and mentor review is recorded in the October report. The mentor or PPMC continues to keep these records current.
date item
2026-11-10 Initial contributions are covered by the contributors' ICLAs, as confirmed by tison. The project follows the CLA-based contribution path described in the Podling IP Clearance guide; no separate SGA was submitted. Incorporated third-party works are covered by the distribution-rights review below.
2026-11-09 Verified the recorded source-header and attribution review for the approved 0.7.4 release in the release tracking issue. ASF notices are included and incorporated third-party sources retain their upstream notices.

Verify distribution rights

date item
2026-11-09 Verified the completed review of incorporated third-party works and their attribution in the 0.7.4 release record, covering the actual source archive and Cargo package.
2026-11-09 Verified the completed distribution licensing review in the 0.7.4 release record and its successful IPMC vote. Licensing and artifact checks remain part of each release.

Establish a list of active committers

date item
2026-11-09 Verified that all nine committers listed above appear in the ASF ICLA records.
2026-11-09 Updated the committer list above against the ASF project roster. It includes Bohao Zhang (iqwqi) and Yijun Zhao (ariesdevil), whose appointments are recorded in the October and November reports.
2026-11-09 Verified that all nine committers have ASF accounts and belong to the Asyncband project in the ASF LDAP records.

Project specific

Initial contribution paperwork and mentor setup are recorded above. Continue maintaining the status page and reviewing subsequent contributions and releases during incubation.

Incubation

These action items have to be checked for during the whole incubation process.

These items are not to be signed as done during incubation, as they may change during incubation. They are to be looked into and described in the status reports and completed in the request for incubation signoff.

Collaborative Development

  • Have all of the active long-term volunteers been identified and acknowledged as committers on the project?
  • Are there three or more independent committers? (The legal definition of independent is long and boring, but basically it means that there is no binding relationship between the individuals, such as a shared employer, that is capable of overriding their free will as individuals, directly or indirectly.)
  • Are project decisions being made in public by the committers?
  • Are the decision-making guidelines published and agreed to by all of the committers?

Licensing awareness

  • Are all licensing, trademark, credit issues being taken care of and acknowleged by all committers?

Project Specific

The graduation readiness discussion is ongoing. Prepare the maturity assessment and graduation proposal, and continue broadening participation in reviews, public decisions, and release management as described in the November report. Graduation approvals have not been recorded.

Exit

Things to check for before voting the project out.

Organizational acceptance of responsibility for the project

  • If graduating to an existing PMC, has the PMC voted to accept it?
  • If graduating to a new PMC, has the board voted to accept it?

Incubator sign-off

  • Has the Incubator decided that the project has accomplished all of the above tasks?